| Catalog Number |
H965103038031 |
| Medical Device Problem Code |
Fracture (1260)
|
| Health Effect - Clinical Code |
No Known Impact Or Consequence To Patient (2692)
|
| Date of Event |
02/10/2016
|
|
Type of Reportable Event
|
Malfunction
|
|
Additional Manufacturer Narrative
|
|
The device from the reported event is expected to return, but has not yet been received.Upon receipt of the sample and completion of the investigation, a supplemental medwatch will be submitted.(b)(4).Device not yet returned to manufacturer.
|
| |
|
Event or Problem Description
|
|
As reported by hospital in (b)(6), an indwelling dialysis catheter was removed and replaced due to a hole located "at the end of the extension tubing ender the end luer cap." the patient condition was reported as being "unaffected" by the event.
|
| |
|
Additional Manufacturer Narrative
|
|
A recent angiodynamics complaint report was reviewed for the product family for the bioflo dialysis product family and the failure mode, "extension leg failure." no adverse trend was indicated.Returned was a used catheter which was confirmed to have a hole in the venous extension tube just under the luer on the front side, as well as a hole in the arterial extension tube just under the luer on the front and back sides.Measurements were taken of the i.Ds, and o.Ds of the venous and arterial extension tubes.Both were found to be within specification.There was no indication that the failure was related to either the manufacturing process or associated tooling.As a definitive root cause for this event could not be determined, a capa has been initiated to provide further investigation and determine if corrective action is required.Manufacturing process controls for the dialysis catheter include visual inspection for damage or defects, 100% leak testing, and guidewire insertion testing to verify lumen patency.(b)(4).
|
| |
|
Search Alerts/Recalls
|