|
The introducer sheath was not returned for analysis; as a result, the clinical observation cannot be confirmed.The event will be re-evaluated if additional information becomes available.The device history records and the complaint files of the lead model were reviewed.No trend of the same or similar type was found or indicated.The potential effect to patient for the reported failure may be related to: improper cap, seal and sideport assembly process, improper overmolding process, components out of specification.Potential cause: mp procedure, qa inspection, leak test dvt, sideport flush dvt, sheath hub bond dvt, three-way stopcock activation test.A review of the risk for this failure mode identified that the risk to be low.Based on the investigation information, a capa is not required.Oscor will continue to monitor this device for complaint trends and risk.Adelante-s introducer sheath in process and final inspections (b)(4) indicates that all products must meet the pre-determined specifications in each step of this procedure.If product does not comply with its specifications, it must be rejected.If the amount of rejects exceeds aql level acceptance criteria, return the whole lot to manufacturing personnel for 100 percent inspection.The inspection of overmolded sheath includes the first 5 good shots and 5 last shots.The remaining parts per sampling plan ansi z 1.4, gen level i, normal, aql 0.25.Visual inspection is done to verify the following: hub to be smooth, no cracks, sinking or unfilled areas, and check for foreign material, verify hub shape as per drawing, check for excessive flash (maximum allowable limit is 0.75 mm2).In addition, using 10x microscope, the hub is looked into for irregularities (verify the transition between sheath and hub on inside of hub is smooth.Score lines of the sheath are inspected to verify alignment with the break line of the hub (handle).Parts are inspected to be free from contamination in the form of oil or residue.The following measurements are taken: sideport opening inspected using 2 different pin gauges, the sheath length is measured from end of hub to tip using metric ruler, id of the sheath hub is measured by inserting a go-no-go gauge of appropriate size all the way through to the tip of sheath for clearance verification.The tipping inspection includes first 5 good samples and last 5 samples; remaining parts per sampling plan ansi z 1.4, gen level i, aql 0.25 for the following: visual inspection of the tip to verify the tip shape is round, no flash, no discoloration or other damages.Verify parts are free from contamination in the form of oil or residue.Verify proper tip shape.Measurement is taken of the sheath length from end of hub to tip using ruler.The sheath tip id is measured using appropriate pin gauge.Sideport with valve assembly is inspected per sampling plan ansi z 1.4, gen level i normal, aql 0.15 to ensure the glue around the perimeter of the hub to the side tube joint and luer valve/stopcock to side tube joint is acceptable.To ensure acceptable hub side tube glued joint/ union inspect for bonding of the tubing to the hub and luer valve/stopcock by pulling slightly on both bonds.The final assembly inspection is per sampling plan ansi z 1.4, gen level i, normal, aql 0.25 for the following: visual inspection of the sheath to verify it is free of kinks, dirt and any other damages, free of loose or embedded foreign material, flash, sinks, verify snap lock cap is placed properly onto sheath hub and free of cracks.Verify that the snap lock cap is securely in place and the tabs are completed inserted into the slots without damage, verify snap lock cap color and french size.Leak test is performed on the seals per sampling plan ansi z 1.4, gen level i, normal, aql 0.40.A 10 cc luer lock syringe is attached to the activated valve/stopcock on the sideport to check for blockage/obstruction by pushing and pulling the plunger of the syringe completely out all at once to confirm air flow through the sideport valve and tube.The sheath tip id is measured using appropriate pin gauge.Destructive testing (sampling plan ansi z 1.4, special level 4, aql 0.40 reduced) for fit check, break and peel test, strength test of hub and side tube joint, and pull test using luer activated valve/stopcock and side tube in opposing pull tester clamps.The instructions for use (ifu) pp-17-003z-x informs the user of the following precautions: indwelling introducer sheaths should be internally supported by a catheter, electrode, or dilator.Dilators, catheters, and pacing leads should be removed slowly from the sheath.Rapid removal may damage the valve members resulting in blood flow through the valve.Never advance or withdraw guide wire or sheath when resistance is met.Determine cause by fluoroscopy and take remedial action.
|