Unit passed the functional test, including the displacement test, rewind, basic occlusion test, occlusion test, prime test, excessive no delivery test and dat test at 0.08680 inches.The stop (idle) current and run current measurement tests are within specification.Unit also passed off no power alarm test and a21 error test.Unit had cracked reservoir tube lip.A complete analysis and testing of the insulin pump showed that it was functioning properly and passed all functional testing.After testing it was concluded that the device operated within specifications.
|