This report is being submitted due to a retrospective review conducted under (b)(4).Submission of this report does not constitute an admission that the importer or manufacturer's product caused or contributed to the event.Device evaluation by manufacturer: the field service engineer (fse) was dispatched on (b)(6) 2015, the fse took the injector valve apart and noticed a clog on port #1, the engineer removed the clog and reseated all tubing.The fse also inspected the rotary valves and assured they were working appropriately.The g8 was working as intended.No further action required by fse.The probable cause of the event was a clog in port 1.
|