| Catalog Number |
02.12.0006L |
| Health Effect - Clinical Code |
Unspecified Infection (1930)
|
| Date of Event |
05/28/2018
|
|
Type of Reportable Event
|
Serious Injury
|
|
Additional Manufacturer Narrative
|
|
Batch review performed on 25 june 2018.Lot 155735: (b)(4) items manufactured and released on 11 january 2016.Expiration date: 2020-12-07.No anomalies found related to the problem.To date, (b)(4) items of the same lot have been already sold without any similar reported event.Gmk-sphere primary extension stem ø11mm / l 30 mm reference (b)(4): lot 162050: (b)(4) items manufactured and released on 25 may 2016.Expiration date: 2021-04-11 no anomalies found related to the problem.To date, (b)(4) items of the same lot have been already sold without any similar reported event.Gmk-sphere tibial insert fixed sphere flex size 5/14 mm l reference (b)(4): lot 152438: (b)(4) items manufactured and released on 10 november 2015.Expiration date: 17.10.2020.No anomalies found related to the problem.To date, (b)(4) items of the same lot have been already sold without any similar reported event.Gmk-sphere patella resurfacing size 4 reference (b)(4): lot 160955: (b)(4) items manufactured and released on 12 may 2016.Expiration date: 21.04.2021 no anomalies found related to the problem.To date, (b)(4) items of the same lot have been already sold without any similar reported event.Gmk-sphere tibial tray fixed cemented size 5 l reference (b)(4): lot 156425: (b)(4) items manufactured and released on 26 february 2016.Expiration date: 2021-04-11.No anomalies found related to the problem.To date, (b)(4) items of the same lot have been already sold without any similar reported event.
|
| |
|
Event or Problem Description
|
|
The patient had a primary on (b)(6) 2016.On (b)(6) 2017 the patient came in due to signs of infection [pathogen not available].The surgeon washed out the knee and swapped the poly.(mdr 2017-00602) on (b)(6) 2018 the patient was revised again.The patient came in due to signs of infection.Pathogen unknown.The surgeon pulled all hardware and implanted a spacer.The surgery was completed successfully.
|
| |
|
Additional Manufacturer Narrative
|
|
Additional information received on (b)(6) 2019 about 1 year and 1 month after spacer implantation, on (b)(6) 2019, the antibiotic spacer was removed and permanent hardware was implanted.The surgery was completed successfully.
|
| |
|
Search Alerts/Recalls
|