Other, other text: one power p.A.C.Was returned for analysis.A fissure in the septum was noted upon visual inspection.Functional testing was performed by infusing water through the port using a gripper product connected to the septum; water flowed through system with no evidence of leaks.The manufacturing process was reviewed finding production personnel performs 100% visual inspection during the assembly and production personnel performs 100% leak test operation during the manufacturing process to the ports.Based on the evidence, the root cause is unknown as the complaint is not confirmed.A device history record (dhr) review was conducted which indicated all inspections were completed and no issues were noted during manufacture., corrected data: g7, previously submitted 31-oct-2018.
|