Mfr received date: 22 aug 2019.Date of report received: 29 aug 2019.The assembly,pcb,mtr ctrlr,v60 was returned to failure investigation for evaluation.Visual inspection of the assembly,pcb,mtr ctrlr,v60 revealed no signs of damage or contamination.This customer returned mc (motor controller) board was working correctly.The customer replaced the mc board to address the reported problem.The unit successfully passed the required performance verification test.Submission of a report does not constitute an admission that medical personnel, user facility, importer, distributor, manufacturer, or product caused or contributed to the event.
|