| Model Number |
199721745 |
| Medical Device Problem Code |
Migration (4003)
|
| Health Effect - Clinical Code |
No Code Available (3191)
|
|
Type of Reportable Event
|
Serious Injury
|
|
Additional Manufacturer Narrative
|
|
(b)(4).A complaint investigation will be performed.The complaint product is not available for the investigation.A supplemental report is not anticipated unless the results of the complaint investigation identify a corrective action or additional relevant information.Should the product become available, a physical evaluation will be conducted and a supplemental report filed with the results.If information is obtained that was not available for the initial medwatch, a follow-up medwatch will be filed as appropriate.
|
| |
|
Event or Problem Description
|
|
It was reported that on (b)(6) 2019, patient underwent revision surgery or the rod reduction, there was a pull-out of two (2) screws with 7 mm diameter which were removed and replaced with two (2) 8 mm screws.During the insertion of one of the 8 mm screws, a pedicle fracture happened.The construct consists now of five (5) screws (2 screws in s1, 1 screw in l5 and 2 screws in l4) connected with the sfx connector.The surgeons managed to correct the spondylolisthesis from stage 2 to stage 1 with an anterior osteophyte on l4 that could not be removed during the surgery.There was a surgical delay of 20 minutes.The patient and procedure outcome were unknown.This complaint involves six (6) devices.
|
| |
|
Additional Manufacturer Narrative
|
|
(b)(4).
|
| |
|
Search Alerts/Recalls
|